It's not just the material. It's what you get out of it.
 
CHALLENGE
The customer wanted to build a high-quality, durable railway bridge to the demanding curve of the railway. The bridge structures needed to adapt to the landscape, while enabling the dense waterborne traffic in the area in summer. Construction speed, the high degree of prefabrication and total economy were significant criteria for choosing Ruukki's solution.

 CONTINUE


Contact us
19.01.2007 Copyright © Rautaruukki Corporation 2007