OUR SOLUTION
Ruukki delivered steel pipe piles for the foundation of the bridge, as well as its welded superstructures. Piling was carried out with Ruukki's prefabricated piles with rock shoes. The demanding soil conditions necessitated significant changes in pile dimensions during the work, which were quickly solved. The superstructures were fabricated and painted into ready-made sections that were transported by road from Ruukki's works in Finland to the site at the exact hour specified.