Some of the noise barrier foundations were realized by a solution, which allows by-passing the pile slab using non-vertical piling. This solution is new and designed for this project due to the challenging foundation conditions. Ruukki's delivery includes totally 300 non-vertical, 12.5-metre-long piles, and 1 500 other piles.