It's not just the material. It's what you get out of it.
 
OUR SOLUTION
We delivered a high-quality pile system that allows extending the piles by means of mechanical joints. Ruukki's driven and drilled RR piles were an excellent choice for this underpinning project. The high load-bearing capacity and the small diameter of the piles made a quick installation possible even in the cramped spaces.

Grout was injected into the piles so that it seeped through holes in the pile between the pile and the earth. Once dry, the grout transferred the load to the surrounding load bearing soil stratum, while also protecting the pile from corrosion. Some parts of the building were so cramped that the piles had to be taken to the site one by one. The total length of the piles used was 2.5 kilometres.